Afghanistan’s North East Power System Phase III: USACE’s Mismanagement Resulted in a System that Is Not Permanently Connected to a Power Source, Has Not Been Fully Tested, and May Not Be Safe to Operate
2018
SIGAR-18-37-IP
Inspection / Evaluation
Special Inspector General for Afghanistan Reconstruction