Coal Operations’ Design Change Notice Process

2019
2018-15587
Inspection / Evaluation
Tennessee Valley Authority OIG
Tennessee Valley Authority

The Tennessee Valley Authority’s (TVA) drawing program is designed and maintained to document the configuration of TVA’s systems, structures, and components. Drawings are utilized for a variety of reasons, including plant operation, maintenance activities, troubleshooting, and to establish clearance...

Organizational Effectiveness – Transmission Operations, Reliability, and Supervisory Control and Data Acquisition

2019
2018-15609
Inspection / Evaluation
Tennessee Valley Authority OIG
Tennessee Valley Authority

The Office of the Inspector General conducted a review of the Transmission Operations, Reliability, and Supervisory Control and Data Acquisition (TORS) organization to identify operational and cultural strengths and risks that could impact TORS’ organizational effectiveness. Our report identified...

Coal Plant Work Management

2019
2018-15581
Inspection / Evaluation
Tennessee Valley Authority OIG
Tennessee Valley Authority

Due to the importance of maintaining equipment in good operating condition and concerns raised during past Office of the Inspector General reviews, we conducted an evaluation to determine if (1) Coal Operations fully implemented the work management process improvements recommended by Reliability...

Organizational Effectiveness - IT Corporate Solutions

2019
2018-15610
Inspection / Evaluation
Tennessee Valley Authority OIG
Tennessee Valley Authority

The Office of the Inspector General conducted a review of the Information Technology (IT) Corporate Solutions organization to identify operational and cultural strengths and risks that could impact IT Corporate Solutions' organizational effectiveness. Our report identified strengths related to (1)...

Reliability of Inventory Data in Maximo

2019
2018-15603
Inspection / Evaluation
Tennessee Valley Authority OIG
Tennessee Valley Authority

Based upon concerns regarding the reliability of data in Maximo, we conducted an evaluation of inventory data in Maximo to determine if (1) data entered into key inventory fields in Maximo was valid and (2) key inventory fields were utilized consistently. We found most key inventory fields were...

Organizational Effectiveness Follow-Up - Materials and Transportation Management

2019
2019-15638
Inspection / Evaluation
Tennessee Valley Authority OIG
Tennessee Valley Authority

The Office of the Inspector General previously conducted an evaluation of Materials and Transportation Management (M&TM) (Evaluation 2016-15586, July 27, 2017) to identify strengths and risks that could affect M&TM's organizational effectiveness. Our report identified several strengths and risks...

Gas Plant Emergency Preparedness and Response

2019
2018-15585
Inspection / Evaluation
Tennessee Valley Authority OIG
Tennessee Valley Authority

Due to the importance of an effective response in the event of an emergency, we conducted an evaluation to determine if (1) emergency response plans at gas plants were up to date and (2) required systems were available and functional.We found 10 of 17 emergency response plans for gas plants were not...

Qualifications for Safety-Sensitive Positions in Power Operations

2019
2018-15605
Inspection / Evaluation
Tennessee Valley Authority OIG
Tennessee Valley Authority

Due to the importance of having qualified personnel in safety-sensitive positions, we initiated an evaluation to determine if minimum job requirements for safety-sensitive positions in Power Operations were met at the time of promotion or hire.We reviewed minimum job requirements for 56 of 141...