The OIG inspection team sought tounderstand how the U.S. GovernmentPublishing Office (GPO) maintainsindoor air quality (IAQ) at the CentralComplex Buildings in Washington, DC.
Open Recommendations
Recommendation Number | Significant Recommendation | Recommended Questioned Costs | Recommended Funds for Better Use | Additional Details | |
---|---|---|---|---|---|
1 | No | $0 | $0 | ||
Perform identified needed repairs to chiller #1 | |||||
2 | No | $0 | $0 | ||
Fully assess the operational condition of the chiller plant and establish a replacement plan as warranted. | |||||
3 | No | $0 | $0 | ||
Develop a plan to address and possibly replace the old and dirty air ducts. If duct replacement is not an option, develop a comprehensive cleaning schedule to address this concern. | |||||
4 | No | $0 | $0 | ||
Update or prepare schematics to reflect the current locations of all ventilation and air cleaning components. | |||||
5 | No | $0 | $0 | ||
Develop and implement a comprehensive renovation plan for the ventilation and air cleaning system at the GPO Central Complex in accordance with the pending building utilization plan. |