Report Description

As a result of delays and overruns on the Tennessee Valley Authority (TVA) Watts Bar Nuclear Unit 2 (WBN U2) construction project, questions have been raised about the quality of the work performed. Nuclear Construction (NC) Quality Assurance (QA) plays a key role in ensuring that work completed meets high-quality standards. The objective of our review was to determine if the NC QA program was effective in its oversight of the WBN U2 construction project. We found NC QA has generally been effective in its oversight of the construction project; however, a breakdown in the QA program resulted in a lack of oversight in one area. With the exception of the breakdown in QA discussed below, no significant issues were identified. In addition, we reviewed documentation that showed NC QA conducted oversight activities and Bechtel performed QA activities. As issues were identified, Problem Evaluation Reports (PERs) were generated to address those issues. A breakdown in the QA program related to the commercial-grade dedication program was identified by the Nuclear Regulatory Commission (NRC). Specifically, there was no oversight of the commercial-grade dedication program by QA since 2008. In response, TVA conducted an evaluation to see if problems existed in other areas. TVA's evaluation found a few areas that required minor adjustments, and those adjustments were made. Furthermore, TVA assembled an independent, technical team to review commercial-grade dedication packages, and as of May 2013, no significant issues had been identified. We also found, that while the turnover of one system has occurred, a process for transitioning the authority for the execution of the QA program from Bechtel QA to NC QA has not been implemented, which could limit the effectiveness of the NC QA's oversight efforts. The process for transition of authority from Bechtel QA to NC QA will provide evidence that the construction phase QA requirements in the Nuclear Quality Assurance Plan have been met and also help to prevent any steps or reviews from being missed. We made recommendations to management to address the findings in the report.

Report Type
Audit
Agency Wide
Yes
Questioned Costs
$0
Funds for Better Use
$0

Tennessee Valley Authority OIG