Report Description

As part of our annual audit plan, the OIG audited costs billed to the Tennessee Valley Authority (TVA) by VECTOR. VECTOR is a joint venture between Bechtel Power Corporation and Sargent & Lundy, L.L.C. (S&L) that provided engineering services for Bellefonte Nuclear Plant Unit 1. Our objective was to determine if the $26.8 million in S&L costs paid by TVA from October 1, 2010, through December 31, 2012, were in accordance with the contract terms and conditions. In summary, we determined VECTOR overbilled TVA $322,535 for S&L's services. The overbilled costs included (1) $236,224 in excessive labor markup costs, (2) $50,685 in ineligible temporary living allowance and travel costs, (3) $14,171 in other ineligible costs, and (4) $21,455 in unsupported costs.(Summary Only)

Report Type
Audit
Agency Wide
Yes
Questioned Costs
$0
Funds for Better Use
$0

Tennessee Valley Authority OIG