DODIG-2018-063
Report Type
Audit
Agency Wide
Yes
Number of Recommendations
0
Questioned Costs
$2,546,203
Funds for Better Use
$0

Open Recommendations

This report has 10 open recommendations.
Recommendation Number Significant Recommendation Recommended Questioned Costs Recommended Funds for Better Use Additional Details
D-2018-0063-D000AV-0001-0003.A3a No $0 $0

Rec. A.3.a: The DoD OIG recommended that the Commander of Navy Installations Command issue guidance to emphasize that tenant organization personnel on Navy installations should coordinate the acquisition of relocatable buildings with the installation's Department of Public Works personnel.

D-2018-0063-D000AV-0001-0004.A4a No $0 $0

Rec. A.4.a: The DoD OIG recommended that the Directorate of Public Works Chief, Marine Corps Base Camp Pendleton, apply for approval of relocatable buildings that initially were never submitted for approval.

D-2018-0063-D000AV-0001-0004.A4b No $0 $0

Rec. A.4.b: The DoD OIG recommended that the Directorate of Public Works Chief, Marine Corps Base Camp Pendleton, establish exit strategies for relocatable buildings that do not have one.

D-2018-0063-D000AV-0001-0004.A4c No $0 $0

Rec. A.4.c: The DoD OIG recommended that the Directorate of Public Works Chief, Marine Corps Base Camp Pendleton, request extensions for relocatable buildings that are past the established expiration date and still needed or terminate the use of the relocatable buildings that are no longer needed.

D-2018-0063-D000AV-0001-0005.A5a No $0 $0

Rec. A.5.a: The DoD OIG recommended that the Directorate of Public Works Chief, Marine Corps Base Camp Lejeune, apply for approval of relocatable buildings that initially were never submitted for approval.

D-2018-0063-D000AV-0001-0005.A5b No $0 $0

Rec. A.5.b: The DoD OIG recommended that the Directorate of Public Works Chief, Marine Corps Base Camp Lejeune, develop procedures to ensure that personnel are performing the required lease-versus-buy analysis before extending existing leases or obtaining additional relocatable buildings.

D-2018-0063-D000AV-0002-0003.B3a No $0 $0

Rec. B.3.a: The DoD OIG recommended that the Commandant of the Marine Corps revise Marine Corps Order 11000.12, Appendix G, and the Marine Corps Headquarters GF-6 Real Estate and Real Property Accountability Handbook to reflect updates made to Department of Defense Instruction 4165.56 and train Department of Public Works personnel on the proper classification of relocatable buildings.

D-2018-0063-D000AV-0002-0003.B3b No $0 $0

Rec. B.3.b: The DoD OIG recommended that the Commandant of the Marine Corps develop procedures to ensure that Department of Public Works personnel properly apply the interim facility requirement when classifying relocatable buildings as required by Department of Defense Instruction 4165.56.

D-2018-0063-D000AV-0002-0003.B3c No $0 $0

Rec. B.3.c: The DoD OIG recommended that the Commandant of the Marine Corps revise guidance to separate non-relocatable buildings from properly classified relocatable buildings within the Internet Navy Facility Assets Data Store system for tracking all facilities if fire and emergency services are needed.

D-2018-0063-D000AV-0002-0004.B4 No $0 $0

Rec. B.4: The DoD OIG recommended that the Chief of Naval Operations revise the Office of the Chief of Naval Operations Instruction 11010.33C to reflect updates made to Department of Defense Instruction 4165.56 and train Department of Public Works personnel on the proper classification of relocatable buildings.