Submitting OIG:
Report Description:
At the request of the Tennessee Valley Authority's (TVA) Supply Chain, we examined the cost proposal submitted by a company for engineering, design, and construction support services. Our examination objective was to determine if the company's cost proposal was fairly stated for a planned 5-year, $200 million contract.
In our opinion, the company's cost proposal was fairly stated. However, we found the company's proposed labor rate ranges were not reflective of the actual salary costs for company employees. Specifically, we found the company had actual salary rates (1) lower than the minimum labor rates proposed for some categories and (2) higher than the maximum labor rates proposed for some labor categories.
(Summary Only)
Date Issued:
Friday, August 21, 2020
Agency Reviewed / Investigated:
Submitting OIG-Specific Report Number:
2020-15734
Location(s):
Agency-Wide
Type of Report:
Audit
Questioned Costs:
$0
Funds for Better Use:
$0
Report updated under NDAA 5274:
No
